Enbridge/OJ Pipelines Stonefell
Location:
Edmonton, Canada
Date Completed:
November 2013
Project Type:
Gas Transmission
Equipment:
Mears’ 1.1 Million lb. rig and 660,000 lb. rig
Client:
Enbridge/OJ Pipelines Canada
Engineer:
Technical Details:
36-inch Steel, Five Crossings: 1,896-ft, 1,099-ft, 1,818-ft, 1,624-ft and 2,841-ft
Type Of Crossing:
Highway, Road, Railroad
Platte River Power Authority Underground Transformer
Location:
Fort Collins (Longmont), CO
Date Completed:
March 2011
Project Type:
Electric
Equipment:
Mears’ 660,000 lb. rig and 160,000 lb. rig
Client:
Platte River Power Authority/Black & Veatch
Engineer:
Black & Veatch
Technical Details:
Nine 8-inch HDPE DR9 bundles with four 2-inch HDPE DR 9 inserted into one 8-inch HDPE, Two Crossings: 2,355-feet and 2,508-feet
Type Of Crossing:
Creek
Enbridge Southern Access Stage II Project
Location:
Belvidere, IL & Bradford, WI
Date Completed:
February 2009
Project Type:
Crude Oil
Equipment:
Mears’ 880,000 lb. rig, 660,000 lb. rig, 330,000 lb. rig and 160,000 lb. rig
Client:
Enbridge Energy
Engineer:
Technical Details:
20-inch Steel: 2,308-ft, 1,812-ft, 2,274-ft, 42-inch Steel: 2,460-ft, 1,917-ft and 2,384-ft
Type Of Crossing:
River, Creek
Overtown-Venetian 138 kV Line Project
Location:
Miami, FL
Date Completed:
April 2009
Project Type:
Electrical Transmission Line
Equipment:
Mears’ 70,000 lb. rig, 160,000 lb. rig and 330,000 lb. rig
Client:
Florida Power & Light
Engineer:
Jacobs Engineering
Technical Details:
9-inch steel, Three crossings: 5,917-ft, 5,188-ft and 5,013-ft
Type Of Crossing:
Marine Crossing
Alta Mesa Services - W-T-W Nueces Bay
Location:
Corpus Christi, TX
Date Completed:
October 2008
Project Type:
Marine
Equipment:
Mears’ lb. rig
Client:
Alta Mesa Services
Engineer:
Technical Details:
2-inch and 4-inch Steel, Two Crossings: 1,155-feet and 1,389-feet
Type Of Crossing:
Ocean
VNG Southeast Connections
Location:
Norfolk, VA
Date Completed:
January 2011
Project Type:
Gas
Equipment:
Mears’ 60,000 lb. rig and 140,000 lb. rig
Client:
Virginia Natural Gas/Southeast Connections
Engineer:
Technical Details:
16-inch and 18-inch steel; Six Crossings: 1,051-ft., 1,246-ft., 1,229-ft., 1,514-ft., 1,278-ft., 1,176-ft.
Type Of Crossing:
Highway
Williams NJ Turnpike
Location:
Bordentown, NJ
Date Completed:
September 2010
Project Type:
Gas
Equipment:
Mears’ 660,000 lb. rig
Client:
TransCanada Pipeline/Price Gregory International
Engineer:
Technical Details:
16-inch steel, 2,475-feet
Type Of Crossing:
River, Highway
Brookwood-TV Hwy HDD Crossings
Location:
Hillsboro, OR
Date Completed:
August 2011
Project Type:
Sanitary Sewer Force Main Replacement
Equipment:
Mears’ 660,000 lb. rig
Client:
Washington County/Emery & Sons
Engineer:
Technical Details:
24-inch HDPE, Two crossings: 1,681-feet and 2,001-feet
Type Of Crossing:
Creek
24-inch Gas Transmission Main Installation
Location:
Tysons Corner, VA
Date Completed:
May 2014
Project Type:
Gas Transmission
Equipment:
Mears’ 330,000 lb. rig
Client:
Washington Gas Light Co./InfraSource
Engineer:
Pennoni Associates Inc.
Technical Details:
24-inch Steel, Two Crossings: 1,751-ft and 1,752-ft
Type Of Crossing:
Highway
Hampton Rd. PL Crossing
Location:
Norfolk, VA
Date Completed:
May 2009
Project Type:
Gas
Equipment:
Mears’ 660,000 lb. rig, 500,000 lb. rig and 140,000 lb. rig
Client:
Virginia Natural Gas/Weeks Marine
Engineer:
Technical Details:
24-inch Steel, Seven Crossings: 965-ft, 2942-ft, 2943-ft, 3003-ft, 3004-ft, 3547-ft, 7352-ft
Type Of Crossing:
3 water-to-water crossings, 2 shore approaches, a river crossing & a golf course crossing
Greenland Lateral. St. John's River Design Build
Location:
Jacksonville, FL
Date Completed:
March 2010
Project Type:
Gas
Equipment:
Mears’ 140,000 lb. rig and 500,000 lb. rig
Client:
TECO / Peoples Gas
Engineer:
JR Giese Operations
Technical Details:
16-inch Steel, 7,390-feet
Type Of Crossing:
River
Keystone Pipeline Republican River Crossing- Clay County
Location:
Clay, KS
Date Completed:
October 2010
Project Type:
Oil
Equipment:
Mears’ 660,000 lb. rig
Client:
TransCanada Pipeline/Price Gregory International
Engineer:
Technical Details:
36-inch steel, 3,225-feet
Type Of Crossing:
River Crossing
Patuxent River Crossing HDD Project
Location:
Solomons, MD
Date Completed:
December 2013
Project Type:
Electric
Equipment:
Mears’ 140,000 lb. rig
Client:
Southern Maryland Electrical Cooperative, Inc. (SMECO)
Engineer:
Black & Veatch
Technical Details:
Bundle of Five 8-inch Fusible PVC for two parallel crossings: 4,522-feet each
Type Of Crossing:
River Crossing
Atlanta Street Car Project
Location:
Atlanta, GA
Date Completed:
February 2013
Project Type:
Electric
Equipment:
Mears’ 60,000 lb. rig and 140,000 lb. rig
Client:
Southern Companies/WA Chester
Engineer:
Technical Details:
8-inch Steel, 1,870-feet
Type Of Crossing:
Road Crossing
Downtown Tunnel/Midtown Tunnel/MLK Extension Project
Location:
Norfolk, VA
Date Completed:
March 2013
Project Type:
Water
Equipment:
Mears’ 140,000 lb. rig and 1.1 Million lb. rig
Client:
Virginia Department of Transportation (VDOT)/Skanska, Kiewit, Weeks, JV (SKW)
Engineer:
Technical Details:
36-inch Steel, 4,500-ft
Type Of Crossing:
River Crossing
Bluffton-Market Place 115kV Underground Transmission
Location:
Hilton Head, SC
Date Completed:
February 2009
Project Type:
Electrical Transmission Line
Equipment:
Mears’ 140,000 lb. rig
Client:
Santee Cooper/WA Chester
Engineer:
Technical Details:
8-inch Steel: 2,571-ft
Type Of Crossing:
Creek
Beach Road Drainage Improvements Gulf Discharge
Location:
Sarasota, FL
Date Completed:
August 2013
Project Type:
Water
Equipment:
Mears’ 140,000 lb. rig and 330,000 lb. rig
Client:
Sarasota County/Forsberg Construction, Inc.
Engineer:
Technical Details:
14-inch Fusible PVC, 2,885-ft
Type Of Crossing:
Marine
I-40 and Fairgrove Church Road
Location:
Conover, NC
Date Completed:
December 2012
Project Type:
Pipeline
Equipment:
Mears’ 70,000 lb. rig
Client:
Piedmont Natural Gas/InfraSource
Engineer:
Technical Details:
8-inch Steel, 1,044-feet
Type Of Crossing:
Road Crossing
Duke Buck HDD- 20-inch Natural Gas Pipeline
Location:
Salisbury, NC
Date Completed:
July 2010
Project Type:
Gas
Equipment:
Mears’ 140,000 lb. rig and 500,000 lb. rig
Client:
Piedmont Natural Gas/Sunland Construction
Engineer:
Technical Details:
20-inch Steel, Five Crossings: 1,146-ft., 913-ft., 893-ft., 949-ft. and 1,093-ft.
Type Of Crossing:
Creek, Highway, Road
PNG Winton Relocation Project
Location:
Eure, NC
Date Completed:
April 2013
Project Type:
Gas Transmission
Equipment:
Mears’ 140,000 lb. rig, 240,000 lb. rig and 330,000 lb. rig
Client:
Piedmont Natural Gas/Appalachian Pipeline
Engineer:
Technical Details:
12-inch Steel, Three Crossings: 1,668-ft., 2,017-ft. and 8,620-ft.
Type Of Crossing:
Highway
Raritan River Crossing
Location:
Iselin, NJ
Date Completed:
May 2010
Project Type:
Water Main Replacement
Equipment:
Mears’ 140,000 lb. rig, 880,000 lb. rig
Client:
Middlesex Water Company/Northeast Remsco Construction, Inc.
Engineer:
Camp, Dresser & McKee, Inc. (CDM)
Technical Details:
24-inch Fusible PVCTM, 5,363-feet
Type Of Crossing:
River Crossing
Underground Transmission Line Projects
Location:
Fort Collins (Longmont), CO
Date Completed:
March 2011
Project Type:
Electric
Equipment:
Mears’ 660,000 lb. rig and 160,000 lb. rig
Client:
Platte River Power Authority/Black & Veatch
Engineer:
Black & Veatch
Technical Details:
Nine 8-inch HDPE DR9 bundles with four 2-inch HDPE DR 9 inserted into one 8-inch HDPE, Two Crossings: 2,355-feet and 2,508-feet
Type Of Crossing:
Creek
Allen Road II Lift Station & Force Main
Location:
Macon, GA
Date Completed:
November 2011
Project Type:
Sanitary Sewer Force Main Replacement
Equipment:
Mears’ 1.1M lb. rig, 70,000 lb. rig
Client:
The Macon Water Authority/Astra Grading & Pipe
Engineer:
In-house
Technical Details:
4,216-feet, 24-inch, FPVC
Type Of Crossing:
Shore Approaches
Port Island to Fisher Island Water Main Replacement
Location:
Miami, FL
Date Completed:
October 2011
Project Type:
Sanitary Sewer Force Main Replacement
Equipment:
Mears’ 1.1M lb. rig
Client:
Miami Dade/Ric-man Construction
Engineer:
Jacobs
Technical Details:
30-inch HDPE, 1,542-feet
Type Of Crossing:
River, Ocean
St. John's River crossing
Location:
Jacksonville, FL
Date Completed:
March 2009
Project Type:
Electric
Equipment:
Mears’ 140,000 lb. rig
Client:
JEA/UTEC
Engineer:
Technical Details:
8-inch Steel, 2,226-feet
Type Of Crossing:
River
Lake Ridge Interceptor Force Main Section B
Location:
Virginia Beach, VA
Date Completed:
April 2008
Project Type:
Force Main
Equipment:
Mears’ 660,000 lb. rig
Client:
Hampton Roads Sanitation District/T. A. Sheets Mechanical Contractors
Engineer:
Technical Details:
48-inch HDPE, 1,155-feet
Type Of Crossing:
Road, River
Hudson Transmission Project
Location:
Manhattan, NY
Date Completed:
November 2011
Project Type:
Electrical Transmission Line
Equipment:
Mears’ 160,000 lb. rig
Client:
Hudson Transmission/Prysmian Power Cables
Engineer:
Technical Details:
14-inch HDPE and 4-inch HDPE, Three Crossings: 1,990-ft., 2,061-ft. and 2,071-ft.
Type Of Crossing:
Shore Approaches
Alberta Clipper and Line 4 Extension Project
Location:
Alberta, Canada
Date Completed:
February 2009
Project Type:
Oil
Equipment:
Mears’ 140,000 lb. rig
Client:
Enbridge PL/Willbros Canada
Engineer:
Technical Details:
36-inch Steel, Seven Crossings: 200-meters, 171-meters, 131-meters, 115-meters, 146-meters, 156- meters, 229-meters
Type Of Crossing:
Road
Mobile Bay Pipeline Replacement Project
Location:
Mobile, AL
Date Completed:
June 2014
Project Type:
Gas Transmission
Equipment:
Mears’ 140,000 lb. rig
Client:
Exxon Mobil/Cal Dive International
Engineer:
Mears Group, Inc.
Technical Details:
4-inch Steel, 4,510-feet
Type Of Crossing:
Mobile Bay Ship Channel
Hayes-Yorktown 230kv Transmission Line Crossing
Location:
Yorktown, VA & Gloucester, VA
Date Completed:
January 2013
Project Type:
Electrical Transmission Line
Equipment:
70,000 lb. rig, 140,000 lb. rig, 330,000 lb. rig
Client:
Dominion Virginia Power
Engineer:
Haley & Aldrich – HDD & Civil; EHV Power – Electrical; Antares Offshore – Structural; RCI – Offshore Consultant
Technical Details:
Two approx. 6,900-feet, two approx. 5,800-feet and two approx. 2,900-feet - for a total of approximately 35,200-feet., 8-inch steel bundled with 3-inch HDPE
Type Of Crossing:
Water-to-water, River Crossing
ConocoPhillips Pipeline Re-route
Location:
Billings, MT
Date Completed:
January 2009
Project Type:
Pipeline
Equipment:
Mears’ 1.1 Million lb. rig
Client:
ConocoPhillips/Pro Pipe Services
Engineer:
Technical Details:
10-inch Steel: 1,633-ft
Type Of Crossing:
Highway, Road
Big River crossing
Location:
Cook Inlet, AK
Date Completed:
April 2010
Project Type:
Pipeline
Equipment:
Mears’ 330,000 lb. rig
Client:
Cook Inlet Pipeline Company/Chevron
Engineer:
Technical Details:
20-inch Steel, 3,026-feet
Type Of Crossing:
River
Emergency Livingston Creek Pipeline Replacement
Location:
Wilmington, NC
Date Completed:
April 2008
Project Type:
Water
Equipment:
Mears’ 140,000 lb. rig
Client:
City of Wilmington, NC/Paul Howard Construction
Engineer:
Technical Details:
36-inch HDPE, 1,177-feet
Type Of Crossing:
Creek
Padre Island Water Supply Project
Location:
Corpus Christi, TX
Date Completed:
July 2014
Project Type:
Utility – Water, Gas and Fiber installation
Equipment:
Mears’ 1.3 Million lb. rig, 140,000 lb. rig
Client:
City of Corpus Christi/Bridges Specialties
Engineer:
Urban Engineering
Technical Details:
5,550-ft and 825-ft of 4-inch Fusible PVC; 18-inch Fusible PVC; and 8-inch Steel
Type Of Crossing:
Intracoastal, Channel
Gig Harbor water-to-water crossing
Location:
Gig Harbor, WA
Date Completed:
August 2010
Project Type:
Water
Equipment:
Mears’ 140,000 lb. rig
Client:
City of Gig Harbor/Advanced American Construction
Engineer:
Technical Details:
24-inch HDPE, 723-feet
Type Of Crossing:
Ocean
Buckeye Pipeline Pipe Relocation
Location:
Indianola, PA
Date Completed:
January 2013
Project Type:
Pipeline
Equipment:
Mears’ 240,000 lb. rig
Client:
Buckeye/Michels
Engineer:
Technical Details:
8-inch Steel, 3,658-feet
Type Of Crossing:
Joe Pool Lake HDD Crossing
Location:
Arlington, TX
Date Completed:
May 2011
Project Type:
Pipeline Transmission
Equipment:
Mears’ 1.1M lb. rig
Client:
Atmos Energy/Canfer Construction
Engineer:
Technical Details:
8-inch Steel, 6,448-feet
Type Of Crossing:
Lake
Little Horse Island to Jericho Island Force Main
Location:
Beaufort, SC
Date Completed:
January 2010
Project Type:
Effluent Force Main
Equipment:
Mears’ 500,000 lb. rig and 140,000 lb. rig
Client:
Beaufort-Jasper Water & Sewer Authority
Engineer:
Technical Details:
16-inch Fusible PVCTM, Two Crossings: 575-ft and 6,333-ft
Type Of Crossing:
Road, Creek
Mobile Bay Pipeline Replacement Project
Location:
Mobile, AL
Date Completed:
June 2014
Project Type:
Gas Transmission
Equipment:
Mears’ 140,000 lb. rig
Client:
Exxon Mobil/Cal Dive International
Engineer:
Mears Group, Inc.
Technical Details:
4-inch Steel, 4,510-feet
Type Of Crossing:
Mobile Bay Ship Channel